This project utilizes a
400kW generator set as a backup power source to ensure the power needs of key areas such as teaching buildings, dormitories, and laboratories, thereby improving the campus's emergency power capabilities. The project is equipped with an intelligent control system featuring automatic start-up, load switching, and fault alarm functions, enabling rapid power restoration within 10-15 seconds after a mains power outage. Since its commissioning, the project has operated stably and responded quickly, receiving unanimous praise from the client.